# Complete and review cadence activities

> Record a real outcome, advance the process and understand protected historical steps.

Canonical HTML: https://proplix.co.uk/help-centre/sales-crm-complete-cadence-activities/

Topic: Sales CRM

Reviewed: 13 November 2026

## Where to start

Sales → Deals & pipeline → Open a deal → Activities

## Before you begin

Open the correct company workspace and confirm View access to the deal and Edit deals to complete activities. Review the original record before following these steps. Open the relevant entry under the native Sales menu; the workspace tabs use shorter labels such as Deals, Reports, Relationships and Sales setup.

## Fields and options

- **Access needed:** View access to the deal and Edit deals to complete activities
- **Permission and scope:** View access to the deal and Edit deals to complete activities

## Follow these steps

1. Locate the current activity marked Cadence step and read its instructions.
2. Carry out the call, meeting, task or email through your usual authorised workflow.
3. Choose the actual outcome and select Complete.
4. Review the newly scheduled step or the cadence’s completed state. If the run is paused, use Resume when it should advance.
5. Use Deal history to review scheduling, pause, resume and ending events.

## Check the result

Confirm the completed activity retains its recorded outcome and has no Reopen control. Confirm the correct next step, due time and owner, or check the ending reason when the process completes.

## Troubleshooting

If the wrong branch ran, review the recorded outcome and template configuration. Do not overwrite an earlier step; add an explanatory activity or start an appropriate new process. If no next step appears, check whether the run is paused, the selected branch ends it, or the deal has closed. If a generated activity is no longer editable, use the cadence’s current controls rather than resubmitting an old form.

## Fields, rules and limits

- Completion records the selected outcome and completion time. It does not send an email or place a call on your behalf.
- Cancelling the current generated activity pauses the run. Resume reopens that same activity.
- Only the current open step of an active or paused run can be changed through activity controls. Earlier, completed or ended-run steps are protected from reopening.
- Create a separate activity when additional work is needed after a recorded step. This preserves the original process history.
- Deal detail shows the most recent 200 activities, 100 history events and ten cadence runs. These are display limits, not instructions to delete older history.
- Activity reports use scheduled due dates and current outcomes. They are not a dedicated cadence conversion or reply-rate report.

## Related guidance

- [Understand the Sales CRM workspace](https://proplix.co.uk/help-centre/sales-crm-deals-overview/index.md)
- [Create and edit sales deals](https://proplix.co.uk/help-centre/sales-crm-create-edit-deals/index.md)
- [Use the deal board, list and filters](https://proplix.co.uk/help-centre/sales-crm-board-list-filters/index.md)

Product reference: https://britixo.com/help-centre/sales-crm-complete-cadence-activities/
