# Set construction and structural details

> Record exterior construction, foundation, basement, ceiling, finishing and new-construction status.

Canonical HTML: https://proplix.co.uk/help-centre/set-construction-and-structural-details/

Topic: Property & Compliance Management

Reviewed: 6 November 2026

## Where to start

Properties Management → Property Operations → Properties → select property → Edit

## Before you begin

You need property View or View Own plus the relevant Create, Edit or Delete capability. Creating or saving a property requires a landlord.

## Follow these steps

1. Open Properties Management.
2. Choose Property Operations.
3. Choose Properties.
4. Select the property.
5. Choose Edit.
6. Record exterior construction, foundation, basement, ceiling, finishing and new-construction status.
7. Use descriptive values consistent with inspection/source evidence.
8. Save the property.

## Check the result

The saved property shows the intended values with its landlord and scope intact.

## Troubleshooting

If you cannot finish, note the address or reference and the message on screen. Check the existing outcome with the person responsible before trying again, especially when a contract, invoice or notification may already have been created.

## Fields, rules and limits

- Use descriptive values consistent with inspection/source evidence.

## Related guidance

- [Set building dimensions and access](https://proplix.co.uk/help-centre/set-building-dimensions-and-access/index.md)
- [Set heating, air conditioning and fuel](https://proplix.co.uk/help-centre/set-heating-air-conditioning-and-fuel/index.md)
- [Set property size and land values](https://proplix.co.uk/help-centre/set-property-size-and-land-values/index.md)

Product reference: https://britixo.com/help-centre/set-construction-and-structural-details/
