Sales & Marketing Hub
Create campaign plans, budgets and measurable goals
Give a campaign a clear objective, original-currency budget, dates and an operational goal your team can actually verify.
Where to start
Marketing → Campaigns → Create campaign
Fields and options
- Access needed
- Manage campaigns, forms and email
- Budget and currency
- Non-negative budget with at most two decimal places and a three-letter currency code. Different currencies are not added into one total.
- Dates
- Dates use YYYY-MM-DD. An end date cannot be earlier than the start date.
- Goal
- Form & survey responses, SMTP accepted messages, or Completed workflow runs. Target is a whole number from 0 to 1,000,000; 0 means no target is set.
Before you begin
Agree the purpose of the campaign and which observed outcome matters. The budget is a planning figure, not automatically imported advertising spend.
Follow these steps
- Create a campaign and enter Resource name, Internal description and Campaign objective.
- Enter Budget and a three-letter Currency code. Set Start date and End date if the campaign has a planned period.
- Enter UTM source, UTM medium and UTM campaign labels that your team intends to use.
- Choose Measure goal using and enter Goal target. Save the draft.
- Open the campaign workspace and review the Campaign plan and goal before attaching assets.
Check the result
Check the saved objective, dates, budget currency and selected goal metric. Confirm the workspace distinguishes planned budget from observed outcomes.
If something does not look right
If a budget is rejected, remove currency symbols and thousands separators from the number. If the response goal is restricted, the viewer may lack permission to inspect submission-related metrics.
Fields, rules and limits
- UTM labels are saved planning values. The Hub does not infer external click attribution or rewrite every link automatically.
- Campaign results count observed activity on currently attached, accessible assets, across all time.
- A planned campaign date does not schedule audience execution or ad-network spending.
Questions and answers
Does campaign budget show actual advertising spend?
No. It is a planned budget entered in the campaign configuration.
Are results limited to the campaign dates?
The current campaign workspace reports all-time observed activity for the assets currently attached.
Related technical reference: Britixo's detailed product guide (opens in a new tab). The screens available to you depend on your configured modules, company and permissions.
Useful next steps
- Sales & Marketing Hub: complete CRM and campaign guide
- Attach campaign assets and review observed results
- Write and personalise a marketing email draft
Contact the Proplix team if you need help with your setup. Include the page or record reference and a description of the issue; leave passwords and private access tokens out of the message.