Skip to main content

Sales CRM

Pause, resume or stop a cadence

Control follow-up without losing recorded outcomes or creating duplicate activities.

Reviewed 13 November 20262 minute read5 steps

Where to start
Sales → Deals & pipeline → Open a deal → Follow-up cadence

Fields and options

Access needed
View access to the deal and Edit deals
Permission and scope
View access to the deal and Edit deals

Before you begin

Open the correct company workspace and confirm View access to the deal and Edit deals. Review the original record before following these steps. Open the relevant entry under the native Sales menu; the workspace tabs use shorter labels such as Deals, Reports, Relationships and Sales setup.

Follow these steps

  1. Select Pause when the process should temporarily stop advancing. The current activity remains visible.
  2. If work is completed while paused, record its outcome normally. No next activity is scheduled until Resume.
  3. Select Resume to continue. An open current activity remains the same activity; a cancelled current activity reopens; a completed current activity follows its recorded branch.
  4. Select Stop cadence to end the run permanently and enter a clear reason.
  5. Review the state and reason in Follow-up cadence and the corresponding Deal history event.

Check the result

After Pause, confirm the badge says Paused and no new step was generated. After Resume, confirm the existing activity or the correct next step appears once. After Stop, confirm the reason is recorded and any open current cadence activity is cancelled.

If something does not look right

A process already ended message means it was completed or stopped by another action. Refresh the deal. A cancelled current step pauses the run automatically. Use Resume to reopen that step instead of trying to reopen its activity directly. If Resume reports an invalid deal or owner, review the deal stage, archive state and owner availability.

Fields, rules and limits

  • Pause affects advancement, not the visibility or due date of the existing activity. It does not suspend other manually created activities.
  • Resuming after an activity was completed uses that original completion time as the next delay anchor. The next activity may therefore already be due.
  • Stopping cancels only the current generated activity if it is still open. Completed steps and unrelated activities are preserved.
  • Moving a deal to Won or Lost, or archiving it, stops its current active or paused cadence. Restoring or reopening the deal does not restart that run.
  • Completed and stopped runs cannot resume. Start a new run when a new follow-up process is needed.
  • Controls recheck the run revision. A concurrent completion or control action requires reopening the deal before retrying.

Related technical reference: Britixo's detailed product guide (opens in a new tab). The screens available to you depend on your configured modules, company and permissions.

Contact the Proplix team if you need help with your setup. Include the page or record reference and a description of the issue; leave passwords and private access tokens out of the message.